On 21.01.2014 a Robbins Main Beam TBM completed the 8.3 km-long Mumbai Water Tunnel, more than 100 m below ground. The tunnel is one of the longest and deepest water supply tunnels in Asia. The 6.25 m-diameter machine displayed excellent performance despite mixed ground conditions, and achieved impressive advance rates of 870 m/month and 58 m/day. Read the press release. Visit www.therobbinscompany.com. 08/14.
16.05.2025 Italy
16.05.2025 Switzerland
20.05.2025 Romania
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
30.05.2025 Poland
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
13.06.2025 Norway
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil