On 21.01.2014 a Robbins Main Beam TBM completed the 8.3 km-long Mumbai Water Tunnel, more than 100 m below ground. The tunnel is one of the longest and deepest water supply tunnels in Asia. The 6.25 m-diameter machine displayed excellent performance despite mixed ground conditions, and achieved impressive advance rates of 870 m/month and 58 m/day. Read the press release. Visit www.therobbinscompany.com. 08/14.
15.09.2025 Italy
15.09.2025 Sweden
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina