On 21.01.2014 a Robbins Main Beam TBM completed the 8.3 km-long Mumbai Water Tunnel, more than 100 m below ground. The tunnel is one of the longest and deepest water supply tunnels in Asia. The 6.25 m-diameter machine displayed excellent performance despite mixed ground conditions, and achieved impressive advance rates of 870 m/month and 58 m/day. Read the press release. Visit www.therobbinscompany.com. 08/14.
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
29.09.2025 Germany
03.10.2025 Netherlands
09.10.2025 Germany