After advancing up to 392 m/month, the 6.26 m-diameter Robbins Slurry TBM broke through at the end of 2012 in China’s southern-most city. The 2.7 km Zhanjiang Bay Sub-Sea Tunnel, scheduled to become operational in March 2013, runs 56 m below water level. It will provide fresh water to the Guangdong Steel Plant via twin pipelines. Read the press release. For more click here and here. Visit www.robbinstbm.com. 08/13.
02.01.2025 Czech Republic
09.01.2025 Switzerland
14.01.2025 Poland
15.01.2025 Romania
15.01.2025 Germany
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
23.01.2025 France
27.01.2025 Switzerland
31.01.2025 Norway
10.02.2025 Switzerland
20.02.2025 Germany
06.03.2025 Germany
01.04.2025 Poland
16.05.2025 Switzerland