The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria