The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Switzerland
21.11.2025 Austria
27.11.2025 Spain
27.11.2025 Switzerland
09.12.2025 Switzerland
09.12.2025 Belgium
09.12.2025 Italy