The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
09.12.2025 Belgium
09.12.2025 Italy
09.12.2025 Switzerland
10.12.2025 Belgium
16.12.2025 Iceland
17.12.2025 Italy
06.01.2026 France
23.01.2026 Switzerland