The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Germany
29.07.2025 Czech Republic
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Spain
15.09.2025 Sweden
15.09.2025 Italy