The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden