The Government authorized the construction of new emergency exits in 7 tunnels of the Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian-French Border line, on the Vitoria/Gasteiz-Bilbao route, with a budget of EUR36,089,660 euros (VAT included). Each safety tunnel runs parallel to its main tunnel at a distance of 30 m from it. For further information please visit http://www.fomento.es/NR/rdonlyres/43f0f93d-a589-4279-a825-9b0ac876db8d/147862/18021603.pdf.
09/18.
03.11.2025 Romania
04.11.2025 Slovakia
04.11.2025 Germany
05.11.2025 Germany
06.11.2025 Belgium
06.11.2025 Slovakia
06.11.2025 Romania
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 Switzerland
13.11.2025 France
13.11.2025 Germany
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Austria
21.11.2025 Switzerland
27.11.2025 Switzerland
27.11.2025 Spain
09.12.2025 Belgium
09.12.2025 Italy
09.12.2025 Switzerland