The Eglinton Crosstown West Extension project at Toronto has hit two major milestones - Rexy, one of the TBMs has completed 6 kms of tunnelling so far. The other TBM, Renny, has completed just over 5.3 km.
The extension will bring the Eglinton Crosstown LRT another 9.2km further west, creating a continuous rapid transit line from the east end of Toronto through the heart of the city and into Mississauga.
For more information click here and ca/39 for the tunnelbuilder archive and also visit https://www.metrolinx.com. 15/24.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden