The Eglinton Crosstown West Extension project at Toronto has hit two major milestones - Rexy, one of the TBMs has completed 6 kms of tunnelling so far. The other TBM, Renny, has completed just over 5.3 km.
The extension will bring the Eglinton Crosstown LRT another 9.2km further west, creating a continuous rapid transit line from the east end of Toronto through the heart of the city and into Mississauga.
For more information click here and ca/39 for the tunnelbuilder archive and also visit https://www.metrolinx.com. 15/24.
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
05.06.2025 Italy
09.06.2025 Switzerland
13.06.2025 Austria
13.06.2025 Norway
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
04.07.2025 Norway
28.07.2025 Brazil