A TBM, built in Germany by Herrenknecht, will be assembled and lowered in the metro station ready to dig and build a tunnel under Nizza Street, first towards Moncalieri and then towards Lingotto for metro Line 1 After starting in September there are still 4 or 5 trips left of the 43 planned, to move all the pieces of the TBM Masha to the site at Bengasi Square in Turin for assembly. Click here and it/26 for tunnel builder archive. Visit http://www.infrato.it/. 46/15.
17.11.2025 Romania
18.11.2025 Germany
20.11.2025 Romania
21.11.2025 Switzerland
21.11.2025 Austria
27.11.2025 Switzerland
27.11.2025 Spain
09.12.2025 Switzerland
09.12.2025 Belgium
09.12.2025 Italy
16.12.2025 Iceland