Lucknow Metro Rail Corporation (LMRC) has successfully
commenced signalling & integrated testing trials for the whole North-South
Corridor (Phase-1A). The integrated testing and trials are for the smooth
operation of the trains and to test their interaction with signalling,
telecommunications, track and traction.
The integrated testing of different systems, signalling,
track and traction is performed at different speeds on the elevated viaduct and
inside the tunnel so they can see how the trains react in different operating
scenarios.
The trains have been provided with the latest
state-of-the-art Communication Based Train Control System (CBTC) and with a Signalling
system with Automatic Train Protection (ATP) for automatic braking to prevent
any collision. Visit here and in/72 for the tunnelbuilder archive. Visit http://www.lmrcl.com. 02/19.