A Sandvik DT1130i three-boom drill rig, one of the new series from Sandvik, is being employed by Taeah Construction to excavate 2.4 km of the Gwanak highway tunnel south of Seoul. In the main tunnels in hard granite, the crown heading requires up to 150 holes, and the bench up to 80 holes. Hole lengths are varied according to five different rock conditions, and the operator can fine tune the automatic functions of the rig online to achieve best result. Consequently, drilling a round in the hardest rock takes just 1.5 h, employing a single operator. Read the detailed press release and visit www.sandvik.com. 13/12.
07.04.2026 Austria
08.04.2026 Norway
09.04.2026 Germany
09.04.2026 France
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
24.04.2026 Switzerland
27.04.2026 Italy
27.04.2026 Switzerland
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Slovakia
04.05.2026 Switzerland
21.05.2026 Bulgaria
04.06.2026 Switzerland
07.07.2026 Germany
31.12.2031 Germany