A Sandvik DT1130i three-boom drill rig, one of the new series from Sandvik, is being employed by Taeah Construction to excavate 2.4 km of the Gwanak highway tunnel south of Seoul. In the main tunnels in hard granite, the crown heading requires up to 150 holes, and the bench up to 80 holes. Hole lengths are varied according to five different rock conditions, and the operator can fine tune the automatic functions of the rig online to achieve best result. Consequently, drilling a round in the hardest rock takes just 1.5 h, employing a single operator. Read the detailed press release and visit www.sandvik.com. 13/12.
15.10.2025 France
20.10.2025 Romania
21.10.2025 Slovakia
30.10.2025 Romania
30.10.2025 France
03.11.2025 Romania
05.11.2025 Germany
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 Switzerland
21.11.2025 Switzerland
27.11.2025 Switzerland
09.12.2025 Switzerland