A Sandvik DT1130i three-boom drill rig, one of the new series from Sandvik, is being employed by Taeah Construction to excavate 2.4 km of the Gwanak highway tunnel south of Seoul. In the main tunnels in hard granite, the crown heading requires up to 150 holes, and the bench up to 80 holes. Hole lengths are varied according to five different rock conditions, and the operator can fine tune the automatic functions of the rig online to achieve best result. Consequently, drilling a round in the hardest rock takes just 1.5 h, employing a single operator. Read the detailed press release and visit www.sandvik.com. 13/12.
12.03.2025 Finland
13.03.2025 Switzerland
14.03.2025 Slovakia
17.03.2025 Norway
17.03.2025 France
19.03.2025 Germany
19.03.2025 Norway
21.03.2025 Spain
24.03.2025 Croatia
24.03.2025 Greece
24.03.2025 Austria
24.03.2025 Romania
26.03.2025 Finland
27.03.2025 Spain
31.03.2025 Sweden
01.04.2025 Poland
01.04.2025 Germany
04.04.2025 Austria
07.04.2025 France
07.04.2025 Spain
08.04.2025 Netherlands
14.04.2025 Switzerland
16.05.2025 Switzerland