Once the rail tunnel is completed, another tunnel will be built next to it, for a southbound dual carriageway, while the existing road tunnel will be used as a northbound dual carriageway. The current Virgolo tunnel on the A22 motorway will remain in its existing state. Click here for the tunnelbuilder archive and also visit https://opencity.comune.bolzano.it. 16/23.
25.11.2024 Austria
27.11.2024 Poland
28.11.2024 Austria
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Norway
13.12.2024 Germany
15.12.2024 Austria
09.01.2025 Switzerland
15.01.2025 Germany
17.01.2025 Spain