Last week TBM Aby broke through at the Vitry Center station on Line 15 South, on the Grand Paris Express. The TBM was first assembled and then launched in June 2019 by the Consortium Horizon which consists of Bouygues Travaux Publics, Soletanche Bachy and BESSAC . The TBM began its journey at the Arrighi shaft in Vitry-sur-Seine and tunnelled towards Villejuif Louis-Aragon station (4.6 km).
After crossing the Ardoines station and the Bel Air structure, Aby is now approaching its final destination, where its arrival is scheduled for the 3rd quarter of 2021.For further information please click here and fr/127 for the tunnelbuilder archive and also visit https://www.societedugrandparis.fr. 10/21.
15.07.2025 Spain
21.07.2025 Germany
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Czech Republic
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands