On 20/07/20 the TBM Koumba arrived at the future Europa service facility in Orly on the extension of line 14 south: click here for the video. The TBM will resume excavation in about two weeks' time, after an overhaul. The TBM will then tunnel towards Pont de Rungis station for another 800 m, from where it will be extracted. The Koumba TBM, which started in June 2019 from the Morangis well, has completed 3.2 km of the 4 km long South section between the Morangis depot/maintenance site and Pont de Rungis station, of the extension of line 14 south which is part of the Grand Paris Express project. For further information please click here and fr/127 for the tunnelbuilder archive. Go to https://prolongementligne14-orly.fr and https://www.societedugrandparis.fr. 30/20.
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina