Construction of the first section of the Moscow Metro Second Circle line (or Third Interchange Circuit - TIC, 61 km with 30 stations) from the station Business Center to the Petrovsky Park station will be completed by autumn 2017. Click here for tunnelbuilder archive Visit https://stroi.mos.ru. 23/17.
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Macedonia
15.05.2024 Czech Republic
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria