On the 14th November at 12.30am Condotte group achieved the final breakthrough in the Paniga tunnel in Morbegno. The tunnel is Lot 1 and the 2nd part of the SS38 Stelvio bypass from he Fuentes junction to Tartano junction. For further information click here and it/127 for tunnelbuilder archive. Also visit http://www.stradeanas.it/sala_stampa/comunicati_stampa/dettaglio/arg/comunicati/id/17345. 46/16.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria