A TBM EPB-Shield (diameter 6.57 m) has been assembled for the Seattle Public Utilities and King County Wastewater Treatment Division's Ship Canal Water Quality Tunnel Storage Project. The TBM is currently undergoing Factory Acceptance testing at the Herrenknecht factory in Schwanau, Germany. The TBM will be shipped to the United States, where it should arrive in January 2021. The TBM will then bore the 4.27 km-long (2.7mile) and 5,73 m diameter ( 18-ft and 10-inch) tunnel for the EUR224.3 (USD255 million) Ship Canal Water Quality Project in Seattle, Washington. The tunnel will keep 283 million liters (75 million gallons) of untreated stormwater and sewage, out of the Lake Washington Ship Canal, Salmon Bay, and Lake Union every year. Click here and here for further information on the project and us/127 for tunnelbuilder archive. Visit https://www.laneconstruct.com/. 44/20.
07.04.2026 Austria
08.04.2026 Norway
09.04.2026 Germany
09.04.2026 France
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
24.04.2026 Switzerland
27.04.2026 Italy
27.04.2026 Switzerland
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Slovakia
04.05.2026 Switzerland
21.05.2026 Bulgaria
04.06.2026 Switzerland
07.07.2026 Germany
31.12.2031 Germany