A TBM EPB-Shield (diameter 6.57 m) has been assembled for the Seattle Public Utilities and King County Wastewater Treatment Division's Ship Canal Water Quality Tunnel Storage Project. The TBM is currently undergoing Factory Acceptance testing at the Herrenknecht factory in Schwanau, Germany. The TBM will be shipped to the United States, where it should arrive in January 2021. The TBM will then bore the 4.27 km-long (2.7mile) and 5,73 m diameter ( 18-ft and 10-inch) tunnel for the EUR224.3 (USD255 million) Ship Canal Water Quality Project in Seattle, Washington. The tunnel will keep 283 million liters (75 million gallons) of untreated stormwater and sewage, out of the Lake Washington Ship Canal, Salmon Bay, and Lake Union every year. Click here and here for further information on the project and us/127 for tunnelbuilder archive. Visit https://www.laneconstruct.com/. 44/20.
09.12.2025 Austria
09.12.2025 Belgium
09.12.2025 Italy
09.12.2025 Switzerland
10.12.2025 Belgium
16.12.2025 Iceland
17.12.2025 Italy
06.01.2026 France
12.01.2026 Austria
23.01.2026 Switzerland