The Factory Acceptance Ceremony for STRABAG’s 12m EPB TBM took place yesterday at the Herrenknecht AG workshop in Schwanau, Germany. The TBM will tunnel the Metrolinx & Infrastructure Ontario’s Scarborough Subway Extension in the City of Toronto. Click here and ca/36 for further information in the tunnelbuilder archive. Also visit https://www.infrastructureontario.ca and http://www.metrolinx.com/en/. 39/21.
06.01.2026 France
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
20.01.2026 Romania
23.01.2026 Switzerland
26.01.2026 Italy