The Factory Acceptance Ceremony for STRABAG’s 12m EPB TBM took place yesterday at the Herrenknecht AG workshop in Schwanau, Germany. The TBM will tunnel the Metrolinx & Infrastructure Ontario’s Scarborough Subway Extension in the City of Toronto. Click here and ca/36 for further information in the tunnelbuilder archive. Also visit https://www.infrastructureontario.ca and http://www.metrolinx.com/en/. 39/21.
06.02.2026 Spain
09.02.2026 Norway
13.02.2026 Italy
16.02.2026 Iceland
17.02.2026 France
19.02.2026 Sweden
23.02.2026 Denmark
23.02.2026 Switzerland
24.02.2026 Italy
19.03.2026 Bulgaria
24.03.2026 Italy
23.04.2026 Sweden
24.04.2026 United Kingdom
04.05.2026 Switzerland