On the 29th August 2017, CREG was awarded a new contract for the supply of a 15.8m slurry TBM. This TBM will be used for the Chunfeng tunnel project in Shenzhen and it will be the biggest slurry TBM ever made before by CREG.
The Chunfeng Project is one the most important municipal projects and will ease the traffic congestion significantly in the Shenzhen megalopolis once completed. The total tunnel length will be more than 5000m, of which 3583m will be built by the TBM. For further information please read their press release here and visit their website http://www.creg-germany.com/
30.04.2025 Austria
30.04.2025 India
30.04.2025 Switzerland
02.05.2025 Germany
05.05.2025 Macedonia
06.05.2025 Germany
07.05.2025 Germany
08.05.2025 Austria
09.05.2025 Germany
09.05.2025 Switzerland
09.05.2025 Poland
13.05.2025 Germany
14.05.2025 Poland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Norway
26.05.2025 Czech Republic
28.05.2025 Italy
05.06.2025 Iceland
16.06.2025 Spain
17.06.2025 France
17.06.2025 Italy
19.06.2025 Italy
19.06.2025 France
27.06.2025 Switzerland
28.07.2025 Brazil