FLAVIA” joins “VIRGINIA”
The last large component of the TBM “Flavia” has arrived at the Mules construction site. A short video shows the long journey that began in Germany on the Rhine and, after passing through Gibraltar and Marghera, ended in Mules.
The transport involved a very bulky and heavy piece of machinery: the head of the TBM (the so-called "maindrive"), which weighs 147.50 tons and has a diameter of 6 m and, for these reasons, was transported first by sea and then by land. To read more about the Brenner Base Tunnel please click this link https://www.bbt-se.com/en/information/news/detail/news/flavia-gelangt-zu-virginia/ . To watch a short YouTube video that shows the long journey that began in Germany please click here https://www.youtube.com/watch?v=5YDx0Rgewhw
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Germany
29.07.2025 Czech Republic
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands