On 8 October 2018 the joint venture between Cipa Spa (LEAD), Injectosond Srl and Paolo Barchi Srl finished the tunnel underneath the San Martino hospital in Genoa. The tunnel was created to transport patients from the special needs ward until recently they had been using shuttles. The project had to modified due to the fact that at 6 meters they encountered anti-aircraft tunnels built in World War 2. To read more please visit http://www.cipaspa.it/. You can also view the breakthrough captured on video here https://www.youtube.com/watch?v=aamh3cyOyMg. 41/18.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil