Last night the 600 tonne TBM, belonging to the consortium of ISG, headed by the Italian company Salini Impregilo, broke through at the Red Line North of al Golf, North East of Doha. The EUR1.8 billion contract involved the construction of two parallel tunnels which are 11.6 km long and with 6.17 m diameter . As a result the 7 underground stations underneath La Corniche, the artificial seafront of the capital of Qatar can be completed. In 2019 the Red, Green and Gold lines will be opened. The Blue circular line will then be built at a later date. So far 85% of tunnels and 55% of the elevated sections have been completed on this project. Click here and qt/13 for tunnelbuilder archive. Visit
http://www.qr.com.qa/ http://www.qr.com.qa/English/Media/News/Pages/Details.aspx?NewsID=549
12/16.
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Germany
13.12.2024 Norway
15.12.2024 Austria
16.12.2024 Belgium
20.12.2024 Norway
23.12.2024 Spain
09.01.2025 Switzerland
15.01.2025 Romania
15.01.2025 Germany
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
27.01.2025 Switzerland
10.02.2025 Switzerland
16.05.2025 Switzerland