Last night the 600 tonne TBM, belonging to the consortium of ISG, headed by the Italian company Salini Impregilo, broke through at the Red Line North of al Golf, North East of Doha. The EUR1.8 billion contract involved the construction of two parallel tunnels which are 11.6 km long and with 6.17 m diameter . As a result the 7 underground stations underneath La Corniche, the artificial seafront of the capital of Qatar can be completed. In 2019 the Red, Green and Gold lines will be opened. The Blue circular line will then be built at a later date. So far 85% of tunnels and 55% of the elevated sections have been completed on this project. Click here and qt/13 for tunnelbuilder archive. Visit
http://www.qr.com.qa/ http://www.qr.com.qa/English/Media/News/Pages/Details.aspx?NewsID=549
12/16.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil