Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Breakthrough on Camarillas railway bypass

16/07/2009
Breakthrough on Camarillas railway bypassAfter a 140-day drive, on 03.07.2009, TBM Nenica broke through on the longest tunnel (2,250 m) of the Camarillas railway bypass on Spain's Chinchilla-Cartagena high-speed line at Hellin, Albacete. The tunnel is a single tube with a 60 sq m section. There are three other short tunnels, total length 435 m, on the same 17.9 km-long line between Albacete and Murcia. Click here for full press release in Spanish and es/95 for project history. 28/09.



NEED QUALIFIED PERSONNEL?