At the end of March 2021 the TBM Adriana (diameter 7 m) reached the future Poggioreale station on the Naples metro Line 1. The TBM will be disassembled and returned to Capodichino, where it will begin to tunnel again at a 40 m depth, this will be the second 1 km tube. Click here for a video, and it/51 for tunnelbuilder archive. Visit https://www.metropolitanadinapoli.it. 14/21.
07.02.2025 France
07.02.2025 Italy
07.02.2025 Poland
07.02.2025 Spain
10.02.2025 Switzerland
17.02.2025 Romania
20.02.2025 Germany
27.02.2025 Romania
06.03.2025 Germany
06.03.2025 Norway
11.03.2025 Italy
13.03.2025 Switzerland
01.04.2025 Poland
16.05.2025 Switzerland