Tunnelbuilder
Home
Diary
Tenders
Awards
Archive
News Feed
Buyers Guide
Product Promotion
Jobs Gallery
Sales
Newsletter
Tracker
Contact
English
Spanish
Italian
German
Chinese
French
Dutch
Japanese
Swedish
Norwegian
Russian
Breakthrough at Capo di Ponte
02/03/2012
On 24.02.2012 JV Collini/Cossi/Giudici/Aster broke through at Capo di
Ponte tunnel on the SS 42 Tonale-Mendola between Darfo and Edolo. The alignment and length of tunnel was altered to avoid an archeological site and underground water conduits. The 8,319 m-long bypass includes the two tunnels Sellero (5,047 m) and Capo di Ponte (1,866 m) and a 1.5 km open air section. Capo di Ponte tunnel cost EUR46 million. The project is scheduled for completion in December, 2012. For more, click
here
and
it/43
. 09/12.
Tweet
Active Tenders
16.12.2025
Iceland
16.12.2025
Iceland
17.12.2025
Italy
06.01.2026
France
12.01.2026
Austria
23.01.2026
Switzerland
23.01.2026
Switzerland
Previous
Next
X