In August 2015 the Government of Bangladesh awarded to the China Communication Construction Company Ltd the contract to build the Karnaphuli road tunnel (3.5 km long, 10 m wide) in Chittagong, Bangladesh. The Chinese Tianhe Mechanical Equipment Manufacturing Company Ltd built a giant underwater TBM to be used to bore the tunnel. Currently it is being assembled in Jiansu, China and it will be shipped to Bangladesh in May 2018. The TBM will start to bore the Karnaphuli river bed by August. The completion date for the tunnel has been estimated to be in 2022. Click here for a video and bd/12 for tunnelbuilder archive. Visit http://en.ccccltd.cn/. 14/18.
15.07.2025 Spain
21.07.2025 Germany
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Czech Republic
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands