In August 2015 the Government of Bangladesh awarded to the China Communication Construction Company Ltd the contract to build the Karnaphuli road tunnel (3.5 km long, 10 m wide) in Chittagong, Bangladesh. The Chinese Tianhe Mechanical Equipment Manufacturing Company Ltd built a giant underwater TBM to be used to bore the tunnel. Currently it is being assembled in Jiansu, China and it will be shipped to Bangladesh in May 2018. The TBM will start to bore the Karnaphuli river bed by August. The completion date for the tunnel has been estimated to be in 2022. Click here for a video and bd/12 for tunnelbuilder archive. Visit http://en.ccccltd.cn/. 14/18.
24.04.2025 Poland
24.04.2025 Romania
25.04.2025 Switzerland
25.04.2025 Norway
25.04.2025 Poland
28.04.2025 Austria
28.04.2025 France
28.04.2025 Germany
30.04.2025 India
30.04.2025 Austria
30.04.2025 Switzerland
02.05.2025 Germany
05.05.2025 Macedonia
06.05.2025 Germany
07.05.2025 Germany
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Italy
16.05.2025 Switzerland
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Norway
26.05.2025 Czech Republic
28.05.2025 Italy
05.06.2025 Iceland
16.06.2025 Spain
17.06.2025 France
17.06.2025 Italy
19.06.2025 Italy
19.06.2025 France
27.06.2025 Switzerland
28.07.2025 Brazil