In August 2015 the Government of Bangladesh awarded to the China Communication Construction Company Ltd the contract to build the Karnaphuli road tunnel (3.5 km long, 10 m wide) in Chittagong, Bangladesh. The Chinese Tianhe Mechanical Equipment Manufacturing Company Ltd built a giant underwater TBM to be used to bore the tunnel. Currently it is being assembled in Jiansu, China and it will be shipped to Bangladesh in May 2018. The TBM will start to bore the Karnaphuli river bed by August. The completion date for the tunnel has been estimated to be in 2022. Click here for a video and bd/12 for tunnelbuilder archive. Visit http://en.ccccltd.cn/. 14/18.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland