The Bam PaKong river in Bangkok, Thailand poses a formidable obstacle to the completion of a 53 km-long raw water transmission line. A Terratec microtunnelling system will be used for the 380 m-long pipejack required. Read the press release and visit www.terratec.co. 06/14.
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway