Consortium Terra Verde - composed of Webuild (leader), GS Engineering & Construction of South Korea’s GS Group and Bouygues Construction Australia of France’s Bouygues - is the preferred bidder for the Tunnels North contract of Suburban Rail Loop (SRL) East. It’s the second SRL East tunnelling contract and it includes the design and construction of two 10 km parallel tunnels between Glen Waverley and Box Hill, 39 cross passages between them and two station boxes, two tunnel access shafts; one intervention and ventilation shaft. The tunnels will be excavated using four TBMs. Detailed negotiations are now underway, and the Tunnels North contract will be awarded later this year. For further information please click here and au/39 for information in the tunnelbuilder archives. Visit https://bigbuild.vic.gov.au, https://www.premier.vic.gov.au and https://www.webuildgroup.com/en. 28/24.
30.01.2025 France
31.01.2025 Germany
31.01.2025 Norway
04.02.2025 Belgium
04.02.2025 France
07.02.2025 France
07.02.2025 Poland
07.02.2025 Spain
10.02.2025 Switzerland
17.02.2025 Romania
20.02.2025 Germany
27.02.2025 Romania
06.03.2025 Germany
11.03.2025 Italy
13.03.2025 Switzerland
01.04.2025 Poland
16.05.2025 Switzerland