Consortium Terra Verde - composed of Webuild (leader), GS Engineering & Construction of South Korea’s GS Group and Bouygues Construction Australia of France’s Bouygues - is the preferred bidder for the Tunnels North contract of Suburban Rail Loop (SRL) East. It’s the second SRL East tunnelling contract and it includes the design and construction of two 10 km parallel tunnels between Glen Waverley and Box Hill, 39 cross passages between them and two station boxes, two tunnel access shafts; one intervention and ventilation shaft. The tunnels will be excavated using four TBMs. Detailed negotiations are now underway, and the Tunnels North contract will be awarded later this year. For further information please click here and au/39 for information in the tunnelbuilder archives. Visit https://bigbuild.vic.gov.au, https://www.premier.vic.gov.au and https://www.webuildgroup.com/en. 28/24.
20.03.2026 Italy
20.03.2026 Germany
23.03.2026 France
24.03.2026 Romania
24.03.2026 Italy
30.03.2026 Italy
31.03.2026 Ireland
07.04.2026 Austria
08.04.2026 Norway
09.04.2026 France
09.04.2026 Germany
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
24.04.2026 Switzerland
27.04.2026 Switzerland
30.04.2026 Switzerland
30.04.2026 Sweden
04.05.2026 Slovakia
04.05.2026 Switzerland
04.06.2026 Switzerland
31.12.2031 Germany