The Italian company Cipa SpA (Sorrento, NA) have been building two tunnels RT3010 (1120m) and RT3030 (660m) for the new railway line (185km) Relizane - Tiaret - Tissemsilt (RTT) in Algeria.
On 06/08/2017 Cipa, broke through to create the RT3030 tunnel, whose full section on both East and West fronts began on 09/12/2015. The average excavation section is approximately 120 m2 with a 6.60 m excavation radius and a 6.15 m length radius. For further information click here and visit http://www.cipaspa.it/ita/news.asp?ds_sub=1&anno=&pag=61. 35/17.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria