The Italian company Cipa SpA (Sorrento, NA) have been building two tunnels RT3010 (1120m) and RT3030 (660m) for the new railway line (185km) Relizane - Tiaret - Tissemsilt (RTT) in Algeria.
On 06/08/2017 Cipa, broke through to create the RT3030 tunnel, whose full section on both East and West fronts began on 09/12/2015. The average excavation section is approximately 120 m2 with a 6.60 m excavation radius and a 6.15 m length radius. For further information click here and visit http://www.cipaspa.it/ita/news.asp?ds_sub=1&anno=&pag=61. 35/17.
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina