On the 08/06/2020 the TBM EPB S-900 Herrenknecht (diameter 15.87 m) completed the excavation of the 7551 m Santa Lucia tunnel on Barberino di Mugello - Calenzano section, A1 Motorway in Italy. Click here for the final breakthrough video, and here for more information on the project and it/268 for tunnelbuilder archive. 24/20.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden