The Lower Thames Crossing online consultation, which closed on the 20.12.2018, has seen over 26,000 replies. The consultation is arguably the most significant that has ever been held into a UK road scheme. The next stage of the project’s development will be to work through people’s comments in detail and use them to produce an updated design which will be submitted to the Planning Inspectorate for planning consent. Subject to statutory processes construction could start in 2022, with the new road opening to traffic in 2027.Click here for the tunnelbuilder archive and also visit https://www.gov.uk/government/news/26000-share-their-views-in-thames-crossing-consultation.
15.07.2025 Spain
21.07.2025 Germany
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Czech Republic
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden
22.09.2025 Netherlands