The Sanitation Districts of Los Angeles County (Sanitation Districts) awarded a EUR533,48 million (USD630 million) construction contract for the Clearwater Project to Dragados USA Inc, belonging to ACS Group. The project will protect local waterways by addressing aging infrastructure and involves building a new 11.27 km (7‐mile) long, 5.49 m (18‐foot) diameter tunnel to convey treated water from the Joint Water Pollution Control Plant in Carson to existing ocean outfalls at Royal Palms Beach in San Pedro. Construction will begin this year and is scheduled to end in 2026. Visit https://www.grupoacs.com/. 43/18.