Invitation to tender, deadline 07.08.2018, for providing all
labor and material for installation and connection of an upgraded M-Line Tunnel
Lighting system. The M-Line Tunnel extends from the San Francisco Transition
Structure, passing through Embarcadero, Montgomery St., Powell St., Civic
Center, 16th St. Mission, 24th St. Mission, Glen Park, and Balboa, for a total
of eight passenger stations and corresponding interlinking tunnels. The work
includes demolition of existing fluorescent fixtures, replacement and addition
of new LED fixtures for tunnel walkway lights, cross passage yellow lights,
emergency trip station blue lights, crossover area lights and fire hose valve
white lights. Provide replacement of lighting circuit wiring with new wiring to
be run in existing conduits and new electrical panels. Including replacement of
damaged conduit sections and/or supports where required. Removing all unused
and/or abandoned lighting system, including but not limited to conduit and
conduit support system, wiring system, and old fixates in M-Line Tunnel.
Provide testing and commissioning of the M-Line Tunnel lighting upgrade. Value
contract EUR7.56-8.42 million (USD8.8-9.8 million). A pre-bid meeting and a
site inspection will be held on 11.07.2018 at 11.00 a.m. it will be at the District's
offices, Oakland, California. A conducted inspection tour of the Jobsite(s)
will be held on July 12, 2018 at 1:30 a.m., at Glen Park BART Station fare
gates, San Francisco, CA. Interested
prospective Bidders have to confirm
their intention to David Bui, tel 510-464-6383, email dbui@bart.gov.
Prospective Bidders or Interested Parties have to be
registered on the BART Procurement Portal on line at https://suppliers.bart.gov in order to download the Contract Documents.
Click here or visit http://www.bart.gov/sites/default/files/docs/15AA-110%20Request%20for%20Advert%20with%20Adv%20Notice%206-19-2018.doc.
Contract n.15AA-110. 27/18.