Refurbished 1.98 m-diameter Lovat soft ground pipejacking EPB underway with Frank Coluccio Construction on 914 m section of Spanway Loop bypass interceptor at depths of 5 m below water table in compact to very dense medium-grained sands, fine sand, silt, gravel and some till. November 1999.