Part of the No 3 water tunnel scheme that involves excavation of 93 km of deep tunnels. Grow/Perini/Skanska completing final 1,500 m of this 7.9 km x 7.06 m-diameter drive in extremely hard granite and gneiss up to 275 MPa with igneous intrusions and abrasivity in the range 3.3 to 4.3 on the Cherchar abrasivity index. Robbins HP TBM 235-282 giving around 1.8 m/h advance in this rock, but frequent cutter changes distort the overall performance. March 1999.