Strabag has been awarded the contract to produce approximately 36,000 precast concrete segments for the eastern section of the HS2's Northolt Tunnel, consisting of a 5.6 km long, twin-tube tunnel between Green Park Way Ventilation Shaft and Victoria Road Ancillary Shaft. The segments will be produced in a state-of-the-art factory to be built and operated by Strabag UK Ltd by December 2022 in the port of Hartlepool in the north of England. The project has been commissioned by Skanska Costain Strabag JV (SCS JV). The delivery will start in spring 2023. Visit https://www.strabag.com/. 41/21.
Information provided by SM/22