Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

United Kingdom

United Kingdom, National - uk/65

High Speed Railway


Keltbray from Esher(UK) secured the contract to provide construction services for the first two ventilation shafts and head houses on HS2’s first two giant tunnel drives at Chalfont St Peter and Chalfont St Giles, on behalf of the Align Joint Venture that is delivering the Central 1 portion of HS2 Phase 1. The shafts will provide ventilation and emergency access to the ten-mile long tunnels Align is digging under the Chiltern Hills. The scope of services Keltbray will provide include reinforced concrete works at the base of the shafts, to create a collar structure to enable the TBMs to pass through the base of the shaft; internal shaft construction works to build slip-formed concrete cores and lining walls; excavation and substructure construction of Head House buildings. Visit https://www.keltbray.com/. 34/21. 

 

Information provided by SM/21



Permalink