On the 01.02.2018 the Municipality of Kocaeli (Turkey)
pre-qualified 15 consortia for a contract to build the 15.6 km-long fully
automated metro line for Gebze district in Istanbul , which will be almost 50
km long . The line will be with 12 stations and 14.7 km underground. Seven of
these companies will receive the qualification in a 40 day period and go
through to the second phase in the second half of March.
The vehicle depot and control center will be made in the
Pelitli area at the end of the line. Visit http://www.kocaeli.bel.tr/icerik/dev-ihaleye-dev-firmalardan-yogun-ilgi/36/39942.
09/18.