Elektrosignal Infra Sthlm AB from Farsta have secured the EUR 3.81 million (SEK43.5 million) contract, excluding VAT, for signal installations for the Stockholm metro Blue line extension from Kungstradgarden to Nacka and Soderort. Contact Region Stockholm, attn Peter Malmsten, Stockholm, tel +46-8-7372500 email peter.malmsten@regionstockholm.se. Visit https://ted.europa.eu/en/notice/-/detail/624079-2024. Ref.n. FUT 2023-0058. 42/24.