The JV Cobra/Cobra Instalaciones y Servicios/Atil Cobra secured the EUR18.8 million contract, VAT included, for safety equipment in the 33 tunnels on 437.6 km Torrejon de Velasco-Motilla del Palancar-Valencia/Albacete section of AV Madrid-Castiglia La Mancia-Comunití Valenciana-Murcia line. In the Cabrera tunnel (7,250 m), in addition to the general protections, it will study emergency exits, fire extinguishers and hydrants, detection of fires, emergency lighting and ventilation. Visit www.grupocobra.com. 41/09.