The Joint Venture Contratas Vilor SL (80%), Lopez Instalaciones Electricas SL (20%) secured the EUR 6.13 million contract, excluding VAT, for the civil protection and safety installations in the tunnels of the Murcia-Almería High Speed Line, section Murcia-Nonduermas. Contact ADIF-AltaVelocidad, Madrid, tel +34 917744804, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/444064-2024. Ref.n. 3.23/20830.0301. 30/24.