Fulcrum SA www.fulcrum.es secured the 18 months contract, value EUR785,033 including VAT, for engineering design for transferring a section of the Madrid-Valencia de Alcantara railway in Illescas (Toledo) underground. The new section is a 3.8 km-long dual track, parallel to the existing railway, entry and exit ramps to the tunnel included, with two new underground stations. The tunnel will be equipped with seven safety exits, one every 250 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287359-2009. 44/09.