Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Slovenia

Slovenia, Karavanke-Obrezje - si/16

Motorway

Procurement notice for civil works for construction of section Šentvid-Koseze on motorway A2 Karavanke-Pbrezje, including the 2,148 m Šentvid tunnel. Difficult construction is anticipated in the first 100 metres in the region of the Celovška road with a minimal cover. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=55441-2003, OJ S 64, or contact Mr. Joze Jenko, Head of Procurement Dept, ZIL Engineering, Kersnikova 10, Ljubljana, Slovenia. Tel. +386 41729636. Visit www.dars.si 15/03. General procurement notice for civil works for section Sentvid-Koseze on motorway A2 Karavanke-Obrezje, including the 2,148 m Sentvid tunnel. First 200 m in cut-and-cover already completed. NATM to be used. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=114360-2003, OJ S 128, or contact Mr. Joze Jenko, Head of Procurement Dept, ZIL Engineering, Kersnikova 10, Ljubljana, Slovenia. Fax +386 1 4304580. Visit www.dars.si 29/03.Open call for bids, deadline 4th August, 2004 for construction of the 1,100 m Sentvid tunnel. It is a two- and three-lane tunnel, cross sections 95 sq m to 140 sq m. Also a 350 sq m cavern. The main rock mass type according to NATM standards is C2 and C3. NATM to be used for construction. Construction cost: SIT13 million (without VAT). Construction to start in October 2004 for completion in December 2006. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=101160-2004, OJ S 120, or contact DARS, Ljubljana, fax +386 14304580. E-mail karel.licen@zilinzeniring.si, milan.crepinsek@zilinzeniring.si or sasa.kos@zilinzeniring.si 28/04.SCT and Primorje secured a SIT9.6 billion contract to build the Sentvid-Koseze section on highway A2 between Karavanke and Obrezje, including the 2 x 1,209 m Sentvid tunnel. The tunnel starts with two lanes from the north side and at about the middle of the length, it may widen to three lanes (this has yet to be decided) until the south entrance. Work has already started from the north entrance, using drill/blast to drive through stone. To date, 120 m has been excavated. Visit www.sct.si and www.primorje.si 15/05.IRGO Consulting and Geoinzeniring secured a SIT268.1 million contract for geological and geotechnical monitoring of the ground movements, the pressure between the ground and the primary lining and in the primary lining itself, and the rock mass displacements as well as geological logging at the tunnel face during construction of the Sentvid tunnel. Visit www.i-rgo.si and www.geo-inz.si 15/05.Invitation to tender, deadline 16.12.2008, for reconstruction of 257 m-long Ljubno tunnel and installation of signals and video surveillance cameras as part of EUR20 million refurbishment of 2.6 km length of A2 highway. Contract duration 20 months. Contact Sektor za razpise, Ljubljana, tel +386 1 3068204, e-mail sasa.stanesic@ddc.si 45/08. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287466-2008 45/08.



Permalink