Leighton Contractors (Asia) Ltd (Singapore Branch) and Yongnam Engineering & Construction (Private) Ltd Joint Venture (Leighton-Yongnam JV) secured the EUR352,64 million (S$553.8 million) contract for design and construction of a 0.64 km section of the NSC tunnel with an entry ramp and an exit ramp between Kampong Java Road and Suffolk Walk. Click here for the location of this section of the NSC. Visit https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=4eae5958-3802-459b-bf08-f97b1793c9a1.
25/18.