Ministry of Public Works considering second crossing of the Panama Canal to complement the Bridge of the Americas by 2006. Proposal under consideration requires 600 m immersed tube in a rock trench on the canal floor at 15 m depth to roof with twin 900 m-long drill/blast rock tunnels to connect at western end and similar NATM tunnels at eastern end. March 2000.