Open invitation to tender, deadline 19/09/2022, for the formulation of a detailed development plan for the E134 on the stretch Dagslett - E18, with junction locations and the necessary access roads. The stretch goes from Hekleberg bridge at Dagslett in Asker Municipality, to the E18 at Reistad in Lier Municipality. The 6.8km section will include a two-lane tunnel (4.4 km) and a 250 m long bridge over Dauruddalen on the border between Lier and Asker. A split-level junction is to be established at Dagslett, and a split-level connection for the new E134 to the E18. The road is to be detailed designed as a four-lane H3 road with a 90km/h speed limit. For tender documents, please click here, where tenders must be sent. Contact the Norwegian Public Roads Administration, att.n Tatiana Liknes, Moss, email tatiana.liknes@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=372170-2022. 28/22.
Norway-Moss: Engineering services
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority
I.3)Communication
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5)Main activity
General public services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
E134 Dagslett E18 - Consultancy assignments for the formulation of a detailed development plan
Reference number: 22/10704
II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.1.4)Short description:
This assignment comprises the formulation of a detailed development plan for the E134 on the stretch Dagslett - E18, with junction locations and the necessary access roads. The stretch goes from Hekleberg bridge at Dagslett in Asker Municipality, to the E18 at Reistad in Lier Municipality. The line that is to be developed is the the municipal sector plan called Viker. The section is approx. 6.8 km. Of this stretch, approx. 4.4 km will be in a two-lane tunnel. There will be an approx. 250 metre long bridge over Dauruddalen on the border between Lier and Asker. A split level junction is to be established at Dagslett, and a split level connection for the new E134 to the E18. The road is to be detailed designed as as four-lane H3 road with a 90km/h speed limit.
II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
71200000 Architectural and related services
71310000 Consultative engineering and construction services
71311210 Highways consultancy services
71311300 Infrastructure works consultancy services
71320000 Engineering design services
71400000 Urban planning and landscape architectural services