AF ABB AS and Nettpartner Drift
AS from Vinterbro secured the EUR16.53 million contract, excluding VAT, for the installation of power and control systems
for the regulation and monitoring of the new E134 Damasen–Saggrenda motorway.
This includes the twin tubes of the
Kongsberg (2 km) and Svartas (1.5 km) tunnels, as well as the single
tube Moane (300 m) and Vollas (490 m) tunnels. For electronic access to
information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/144114. Contact
the Norwegian Public Roads Administration Southern Region, att.n Hans Olav
Dalen, Arendal, tel +47 02030, e-mail hans.olav.dalen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=344746-2016. Ref.n. 16/30065. 41/16.