City of Monterrey plans to build 19 km drainage system of 6 m to 8 m diameter tunnels at depths to 40 m to reduce flooding. Estimated cost $265 million. February 1997.
Permalink
For Currency Converter click HERE
03.11.2025 Romania
04.11.2025 Slovakia
04.11.2025 Germany
05.11.2025 Germany
06.11.2025 Belgium
06.11.2025 Slovakia
06.11.2025 Romania
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Austria
21.11.2025 Switzerland
27.11.2025 Switzerland
27.11.2025 Spain
09.12.2025 Switzerland
09.12.2025 Belgium
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.