Design studies by Montgomery Watson include 4.1 km tunnel 2.8 m-diameter from Joun hydro station to purification plant at Ouardinaye and 19.7 km bored aqueduct to conduct treated water to Khalde, south of Beirut. Cast concrete lining with some steel in places. World Bank funding. Prequalification in process. April 1999.