The Consortium Dolomiti Webuild Implenia from Fortezza have secured the EUR 1.07 bn contract, excluding VAT, for the design and construction for the quadrupling of the current Fortezza-Verona railway, section Fortezza-Ponte Gardena (Lot 1). The new 25 km from the Fortezza interconnection to the Ponte Gardena station, will include the two twin -tube tunnels Scaleres (15.4 km) and Gardena (6.3 km), joined by a viaduct over the Eisack River. Contact RFI SpA, Rome, attn Giuseppe Albanese, email rfi-ad-dac.ge@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=462217-2022. Ref.n.DAC.0132.2020. 34/22.