Open invitation to tender, deadline 23/07/2024, for the assignment of works for the construction of the 3.3 km extension of the M1 line through the Baggio, Olmi and Valsesia districts in Milan. The westward extension of the M1 line will run from the existing Bisceglie station to a completely underground section and will include three stations (Parri-Valsesia, Baggio and Olmi), six structures along the line and a new train depot. The tunnel will be almost entirely built with TBMs, to minimise surface impacts. The tender includes an option for works to complete the extension of the M1 metro line on the north side from Sesto FS station to Monza. Click here for bid/tender documents and where tenders must be sent. Value of contract EUR433.48 million, excluding VAT, for the main lot and EUR50.89 million, excluding VAT, for the option. Duration of contract 2026 days. Contact MM SpA, Milan, tel +39 0277471, email info@pec.metropolitanamilanese.it. Visit https://ted.europa.eu/en/notice/-/detail/412108-2024 and https://ted.europa.eu/en/notice/-/detail/311778-2024. Ref.n. 03/2024/APL. 29/24.