Open invitation to tender, deadline 26th June, 2008 for construction of a 992 m bypass tunnel in Ceppo Morelli. This is a single bore bidirectional tunnel, with one 3.50 m-wide lane per direction. A pilot tunnel will first be constructed, using a 4 m TBM, and then be widened using drilling and blasting. Support will comprise wire mesh, bolts, shotcrete and steel arches. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=116815-2008, OJ S 86, and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123861-2008, OJ 92, or contact SCR, Turin, fax +39 0114323570. E-mail appalti@scr.piemonte.it 26/08.Joint venture of Cogeis, Cave Spadea and Geodata has secured the EUR21.4 million contract for construction of a 992 m-long bypass tunnel in Ceppo Morelli. This is a single bore bi-directional tunnel, with one 3.50 m-wide lane per direction. A 4 m-diameter TBM pilot tunnel will first be bored, and then widened using drilling and blasting. Support will comprise wire mesh, bolts, shotcrete and steel arches. Visit www.geodata.it, www.cogeis.it or http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=029058-2009, OJ S 21. 06/09.