Elettrica System pocketed a EUR3 million contract to rehabilitate the lighting equipment in tunnels on highway A10 Genoa-Ventimiglia-French border: Madonna delle Grazie II (386 m), Vignetta (734 m), Cavetto I (241 m), Cavetto II (295 m), Varazze (374 m), Cantalupo (768 m), Piani di Celle (363 m), Costa (Genoa-bound tube, 79 m), Cassisi (France-bound tube, 505 m), Pecorile (France-bound tube, 662 m), Siri (500 m), Termine (308 m / 225 m), Ranco (272 m / 260 m), Letimbro (2 x 241 m); in the Madonna delle Grazie tunnel (387 m / 388 m) on the junction with the A26; and on the Adriactic coast highway A14 Bologna-Taranto: Scacciano (225 m / 255 m), Novilara (285 m / 280 m), Cavallo (501 m / 499 m), Montedomini (283 m / 278 m), Sappanico (862 m / 892 m) and Porto San Giorgio (854 m / 847 m). Click here. Visit www.elettricasystem.it 20/08.Tunnel Works Srl (Lc) has been awarded the EUR230,448 contract for maintenance of the Provenzale tunnel (right lane, 958 m) on the A10 Genoa-Savona. More from info@tunnelworks.it. 09/09.