Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

India

India, Uttar Pradesh - in/94

Mass Rapid Transit System

Closing Date: 10.11.2021 (Tender Closed)


Deadline postponed from 27/10/2021 to 10/11/2021 for the open invitation to tender for the design and construction of a tunnel from the start of the underground ramp near Fatehabad Road Metro Station to the end of the ramp after the RBS college Metro Station with 7 underground metro stations (Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical College, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India. Value of the contract EUR 249,84 million (INR20 bn), excluding VAT. Duration of the contract will be 48 months. Contact Uttar Pradesh Metro Rail Corporation (UPMRC), attn Col. Ashish Dwivedi, Lucknow, tel +91 9746837100, email cecontract@upmrcl.co.in. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=549107-2021. Ref.n. EIB-GtP/AGCC-02. 43/21.  



Permalink